Republic – Deck C-Channel Going In

20 11 2009

We’ve had a good stretch of sunny days in the past few weeks and have made excellent progress – I thik we’ll be seeing rain tonight and tomorrow, but we are hopign to wrap up work on Republic by December 1st!  Here’s a view of the deck C-channel/nailers going in and the stone continuing to be laid on the sides of the deck structure.  This is a view from atop the pile of granite gravel that was our surrounding pathway and will be again soon.





More Trees for Pease

15 11 2009

peasea1114

Over 100 more trees (complete with in ground irrigation) were installed by volunteers today at Pease Park.  Thanks to Richard Craig and Trees for Pease, as well as the City of Austin Parks Forestry Division, TreeFolks and our many volunteers.  We have another 40 or so trees to be planted sometime in the next month or two that we could not get to the park today.

peaseb1114

peasec1114

 





Steel and Stone at Republic

12 11 2009

 

rep-1111a

Stone cladding on the "front" of the deck structure

We’re making great strides with the most of the stone cladding now in place on the outside of the deck structure, most of the major steel beams set in place in the interior, with interior stone cladding about to begin as well as the deck steel supports to be installed once all of the big steel beams are welded into place.  We’re thinking, barring another wave of rainy days, about two more weeks of work until completion.  Our fingers continue to be crossed.

 

rep-1111c

Major Steel Beams in Place

 

 

 





Republic: Stone Panels

4 11 2009

The limestone panels (several inches thick) are going into place around the exterior of the deck at the Auction Oaks site at Republic Square.  Picture from yesterday afternoon:

 

rep-panel1102

Limestone panels in place on both sides of stone pier

rep-panel1102b

Side view showing how the panel fits into place

 

 