Day 3: Red Bud Shoreline Project

10 07 2008

Just back from another trip to Red Bud, and apart from my camera’s drained batteries, Things are looking really good. All of the steps are in place, e-corps is now working on fitting rocks into the sides of the steps to lock everything in securely and then will be working on filling the area behind the steps with rock, gravel and dirt and pulling rock in the water up close against the bottom two sets of steps. I’ll get out there tomorrow and take some fresh pictures with some fresh batteries.

Bern's dogs are already checking out the steps under construction on day 2.

Bern's dogs are already checking out the steps under construction on day 2.








Follow

Get every new post delivered to your Inbox.